# Exclusion Engineering

> Calgary pest exclusion: mesh, hardware, and sealant specified for freeze-thaw. Close the 6 mm joint so mice do not return.

Canonical: https://www.frameworkpest.ca/services/exclusion-engineering/
Last updated: 2026-11-02

Permanent correction

Screens, seals, and hardware that hold up to prairie weather.

[Book an inspection](https://www.frameworkpest.ca/contact/) [Get the season guide](https://www.frameworkpest.ca/guide/)

The discipline

Exclusion is construction, not pest control theatre. We specify and install the corrections that stop entry: door sweeps that actually meet the slab, vent screens that survive Chinooks, and sealant systems that move with the assembly.

Calgary punishes cheap exclusion. Acrylic caulk, plastic vent hoods, and garage seals that lift in a Chinook are how last year’s ‘pest-proofing’ becomes this year’s mouse. We spec stainless or galvanized mesh, hybrids that move, and hardware that can be replaced without a philosopher on site.

We will still bait or trap while a pathway is open. We will not pretend that is the product.

## What’s included

- Rodent-proofing of doors, docks, and grade transitions
- Vent, soffit, and mechanical penetration screening
- Weep, cladding, and below-grade detailing
- Coordination with facility teams and contractors
- Materials selected for Calgary freeze-thaw cycles

Who it’s for

Anyone tired of renting relief, from infill garages to 200-metre dock faces.

Timing

Small residential packages in days. Commercial docks and rain-screen work scheduled around occupancy and weather.

Also in the method

- [Structural Assessment](https://www.frameworkpest.ca/services/structural-assessment/)
  We walk the building and list how pests are getting in.
- [Monitoring Programs](https://www.frameworkpest.ca/services/monitoring-programs/)
  Inspection schedule and reporting a property manager can use.
- [Targeted Intervention](https://www.frameworkpest.ca/services/targeted-intervention/)
  Treat what is already inside, then close the entry.

How the work runs

## Four movements, applied to this discipline.

1. 01
  ### Specify
  Mesh, hardware, and sealant chosen for the assembly and for freeze-thaw, not foam in a can.
2. 02
  ### Coordinate
  Facilities, tenants, and other trades. Exclusion is construction. It needs a window, not a surprise.
3. 03
  ### Install
  Sweeps that meet the slab, vents that survive Chinooks, weeps that still drain, sleeves that no longer take a mouse.
4. 04
  ### Prove
  Photos of the closed joint. Monitoring points where the building used to fail.

You leave with

## A file, not a fog of product names.

- Material spec (mesh, modulus, hardware)
- Installed exclusion at ranked pathways
- Photo close-out per opening
- Maintenance notes facilities can follow
- Handoff into monitoring if the asset needs a record

Sectors that use this

[Commercial Real Estate](https://www.frameworkpest.ca/industries/commercial/) [Multi-Residential](https://www.frameworkpest.ca/industries/multi-residential/) [Industrial & Warehousing](https://www.frameworkpest.ca/industries/industrial/)

Questions

## About this discipline

### Will this void a cladding or roof warranty?

We coordinate with the envelope and the manufacturer’s logic. The point of exclusion is to belong on the building, not to fight it.

### Can our contractor install from your spec?

Often. Some clients want us to install; others want a spec they can tender. We will say which is honest for the detail.
